P27 / PHYSICAL SYSTEMS

SOURCE THE WHOLE PHYSICAL STACK.

Power, cooling, water, racks, cabling, robotics, monitoring, and safety. Coordinated around the operating brief.

01 / AI INFRASTRUCTURE STACK

Where P27 operates.

P27 focuses on energy and physical infrastructure beneath and around compute.

LAYER 03 / PHYSICAL P27 SCOPE

Infrastructure

Systems that house, power, cool, connect, move, monitor, and protect compute.

FIG. 101 / FIVE-LAYER AI INFRASTRUCTURE STACK / CONCEPTUAL

02 / SYSTEM FLOW

Power in. Heat out.

Two directional systems meet at the rack. Every connection between them is physical infrastructure.

POWER / 01GRID TO RACK
01GRID
02TRANSFORMER
03SWITCHGEAR
04UPS
05BUSWAY
06RACK PDU
07AI RACK
THERMAL / 02RACK TO REJECTION
07DRY COOLER
06CHILLER
05PUMPS
04PIPING
03CDU
02MANIFOLD
01AI RACK

DRAWING 102 / POWER DISTRIBUTION AND COOLING LOOP / NOT FOR CONSTRUCTION

03 / COORDINATED CATEGORIES

The physical systems around compute.

Every category is selected against the project location, density, resilience, and operating model.

01 / POWER

GRID TO RACK.

Facility and white-space power paths, conversion, resilience, and monitored distribution.

  • Transformers
  • Switchgear
  • UPS
  • Generators
  • Busway
  • Rack PDUs
02 / COOLING

CAPTURE TO REJECTION.

Air, liquid, and hybrid systems for heat capture, transfer, and rejection.

  • CDUs
  • Cold plates
  • Manifolds
  • Chillers
  • Dry coolers
  • Rear-door HX
03 / WATER

MOVE HEAT.

Cooling-water and process-piping systems from plant interfaces to rack connections.

  • Pipe
  • Valves
  • Pumps
  • Filtration
  • Interfaces
  • Leak detection
04 / RACKS

HOUSE DENSITY.

Physical rack systems selected for load, cooling method, access, and data-hall conditions.

  • AI racks
  • OCP racks
  • Seismic racks
  • Rails
  • Containment
  • Locks
05 / CABLING

CONNECT SYSTEMS.

Structured fiber, copper, power pathways, management, and grounding.

  • Fiber trunks
  • MPO / MTP
  • Copper
  • Patch panels
  • Cable tray
  • Grounding
06 / ROBOTICS

MOVE EQUIPMENT.

Equipment movement and handling workflows from dock and staging to the data hall.

  • Rack movers
  • Server handling
  • Carriers
  • Charging
  • Fleet control
  • Recovery tools
07 / MONITORING

MEASURE STATE.

Physical sensors and gateways for electrical, thermal, and environmental visibility.

  • Power meters
  • Temperature
  • Humidity
  • Leak sensing
  • Gateways
  • Interfaces
08 / SAFETY

PROTECT SPACE.

Representative fire detection and physical safety categories, selected to project requirements.

  • Early warning
  • Detection
  • Suppression interface
  • Access
  • Alarms
  • Project review

04 / DATA CENTER EXPLORER

Click through the physical architecture.

A simplified map of representative systems around an AI data hall.

Utility yard
Cooling plant
Data hall

Component / White space

AI Rack

Houses compute while receiving power, cooling, and connectivity.

Example specification
Standard, OCP, and project-specific frames.
Compatible systems
Rack PDU, busway, CDU, fiber
Enquire about this system

FIG. 104 / PHYSICAL SYSTEMS / SIMPLIFIED

05 / REPRESENTATIVE PROCUREMENT

Build a project list.

These are representative sourcing categories, not fixed products. Specifications, certifications, availability, and commercial terms require engineering and supplier validation.

P-001 / POWERRepresentative

MV Switchgear Assembly

Utility and facility electrical interface. Voltage class, topology, and protection are project dependent.

P-002 / COOLINGRepresentative

Facility CDU

Liquid-to-liquid heat exchange for a secondary cooling loop. Capacity and interfaces require engineering review.

P-003 / WATERRepresentative

Chilled-Water Pipe System

Primary or secondary loop piping. Material, pressure class, supports, and QA are project dependent.

P-004 / RACKSRepresentative

High-Density AI Rack

Liquid-ready or project-engineered rack category for AI and HPC environments.

P-005 / CABLINGRepresentative

MPO/MTP Fiber Trunk

High-density structured fiber category for project-defined physical network architecture.

P-006 / ROBOTICSRepresentative

Autonomous Rack Mover

Equipment movement category for dock-to-data-hall logistics. Manufacturer and configuration require validation.

P-007 / SAFETYRepresentative

Aspirating Smoke Detection

Very early warning detection category for project-defined rooms and operating requirements.

P-008 / MONITORINGRepresentative

Environmental Sensor Gateway

Temperature, humidity, and leak-sensing interface category for BMS or DCIM integration.

Turn categories into an engineering brief.

Select representative items, define the operating requirements, then send the combined brief for review.

Build a project